1. Assess — energy use, systems and improvement goals.
2. Scope — define the technologies, savings targets and integration plan.
3. Approve — coordinate design, permissions and technical specifications.
4. Execute — install, connect and configure each system.
5. Hand Over — test, commission and explain the controls.
6. Support — monitor performance and optimise over time.